← Back to portfolio

Case study / 07 ยท Release engineering

Taking release turnaround from 2 days to 2 hours

Shipping a mobile release used to eat two days of someone's time. Automating it with Fastlane brought that down to about two hours, and made releases boring in the good way.

Problem

Every release meant building for iOS and Android, sorting out signing, uploading to App Store Connect and the Google Play Console, and walking it through review. Done by hand, it took around two days, it depended on one person's machine, and small mistakes in signing or versioning kept slipping in.

Approach

Result

What I took from it

The real win is not the hours saved on one release. When shipping is cheap, teams ship smaller changes more often, and smaller changes are much easier to roll back.